Phasing

The scheme allows for a phased approach to the construction work, the public areas and the infrastructure. The phasing of the plan entails 5 or 6 stages, with sub-phases possible. This approach takes account of the concessions already granted in the area and the possibility of redeveloping or rehabilitating the existing operations.

  • 31 mars 2015 : Remise des premières propositions NEO II
  • Octobre 2015 : Fin première phase de dialogue NEO II
  • Début 2017 :  Décision d’attribution NEO II
  • 2017 : Début des travaux NEO I
Phasing